Contract 882 is for the construction of Keppel station and tunnels for Circle Line stage 6. The assigned contractor is a joint venture between China State Construction Engineering Co (CSCEC) & Nishimatsu. Both contractors in this joint venture have been involved in MRT construction locally before with projects on the Downtown and Circle Lines.
 |
| 11 February 2019 - Project details on a signboard near one of the site access gates. |